
Brief Description Project:
In 2021, Paramount Construction completed the construction of the Correct Critical Access Control & Security Deficiencies, located in Tuscaloosa, Alabama. This $4.9 million project, commissioned by The Department of Veteran’s Affairs, was completed over a 12-month timeline from initial demolition, build, and final inspection.
This project included the installation of a perimeter fence, fencing upgrades and repairs along sections of existing perimeter fencing, replacing existing cameras with new cameras, installing new cameras, connecting existing cameras to the campus CCTV network. Notable features include state-of-the-art operating rooms, patient recovery areas, and sustainable design elements to enhance energy efficiency.