SCOPE OF WORK: PCG was subcontracted to perform the wood framing and setting of pre-engineered trusses for the Entergy Nuclear Power Station. This required a high degree of safety and quality control with Paramount working from lifts and significant heights.  Value engineering was included in the contract.

The trusses that were ordered had to be modified in the field to allow for miscalculations during engineering. Paramount was able to keep the project flowing, and finished within the allotted time despite the added scope.